Waterfront Composite Deck Replacement
- TimberTech Antique Leather Composite Decking
- Dry Under-Deck Living Space With Azek Ceiling
- Verticable Cable Railing For Unobstructed Views
- Custom Paddleboard Storage
Location: N Quiet Bay Cir, Cicero, IN
Price: $110,850


Part One: Initial Consultation
When homeowner Timothy looked at his aging deck, he saw more than peeling paint.
He saw a space that was actively falling apart and holding his family back from enjoying their own waterfront.
Timothy wanted something different: a low-maintenance deck that kept a clear view of the water, a dry patio underneath he could actually use, and smarter storage for the family’s paddleboards.
We walked the property with him to see the issues firsthand and start mapping out a plan for this massive deck replacement project.
Here's everything we found during the initial consultation...

Rotting wood
The old decking had rotting wood underneath that was splintering and unsafe.

Deteriorating stairs
The white-painted stair posts and steps were heavily weathered and outdated.

Water intrusion
The under-deck patio was completely open, letting water, algae, and mold in.

Blocked water views
Thick balusters stood between the family and the beautiful lakeside view.

Wasted storage
The space under the stairs was boxed in with lattice, making it unusable.
Part Two: The Design, Planning, Permitting
Solving Timothy’s problems meant rethinking the deck from the ground up. Not just replacing boards, but re-engineering how the whole structure handled water, sightlines, and storage.

This top-down view lays out the full deck footprint: the main 27′ deck, two small landing platforms up top, and an angled secondary deck below.

This 3D model shows how the elevated deck connects to the home, with a full staircase leading down to the yard and a smaller side staircase for easy access.

This angle highlights how the deck sits above a covered concrete patio below, with connecting stairs and a side deck, making the most of both levels rather than leaving the area beneath unused.

This diagram plans out the concrete patio and staircase dimensions beneath the deck, ensuring the support structure and walkways are sized correctly.
Part Three: The Time Schedule
Good planning made the difference. The full project ran from initial estimate to closeout over several months, but once work began on-site, the construction of this major deck rebuild only took 4 weeks.
June
Timothy reached out and an initial proposal was sent following an on-site consultation.
July
Design details were refined: post wrapping, stair construction, and the water management system were all worked through together. Timothy also opted to simplify the layout, dropping a secondary deck section to keep handrails from blocking the water views.
August
The finalized proposal was signed and the 25% deposit was paid to lock in the project schedule.
Sep – Oct
Materials were ordered, and on-site demolition and framing kicked off October 21.
November
Framing, decking, railing, and ceiling work were completed. The project was finished and closed out by November 19.
The Deck Transformation Is Complete
A rotting, water-damaged deck is now a premium waterfront living space the whole family can enjoy.
Waterfront Composite Deck Replacement
This project included:
- Planning, permitting, design, and inspections
- Full demolition of the old deck and stairs
- New treated wood framing
- TimberTech Antique Leather composite decking
- Matching structural posts, beams, and porch columns
- TimberTech Impression Rail Express cable railing
- Trex RainEscape & AZEK Alpine WP4 Harbor Ash ceiling
- 8 new accent lighting
- Gas line installation for the grill
- New capped furnace vent
- Custom enclosed storage for paddleboards

TimberTech Antique Leather Composite Decking
A durable, splinter-free composite that gave Timothy the warm, wood-look finish he wanted without the maintenance of real wood. It’s used across the deck surface, picture-frame border, and every wrapped post and beam.

TimberTech Impression Rail Express Vertical Cable Railing
A dark bronze, powder-coated aluminum railing with slim vertical cable infill, keeping the water view open while still meeting safety requirements. It’s finished with a matching composite drink rail on the level sections.

Trex Rain Escape & AZEK Alpine WP4 Under-Deck Ceiling
Together, these turned a water-damaged, unusable patio into a finished outdoor room. A hidden trough system carries water away above, while a Harbor Ash wood-grain ceiling finishes the space below.
Materials And Finishes Used
This Deck Was $110,850
This custom deck came with a full rebuild: new structure, low-maintenance composite, finished ceiling, and custom storage, all built to handle the waterfront life for years to come.

Hey! I'm Carter, The Owner Of Decks On Point!
I got my start in this business at just 11 years old, tagging along on job sites with a family friend. I worked my way up: handing over tools, hauling materials, and eventually building decks with my own two hands.
Growing up in the trade taught me the codes and materials inside and out, from the ground level.
If you’re looking for a deck built to a higher standard than the industry norm, Decks On Point is the right call.
You’ll get a smooth, stress-free experience, a deck you’ll love for years, and a team that keeps you informed every step of the way
350+
decks built & repaired
200+
12+
years of experience
3-yr
work warranty
200+ Happy Homeowners And Counting
Whether it’s a custom multi-level build or a smaller upgrade, here’s what our clients have to say about their experience with Decks on Point.

Craig Replogle
Carter did a great job on my mom’s deck. Showed up everyday as promised even though the weather was not good. Cleaned up and did great work. Very happy. Strongly recommend.


Biniam Gebremichael


Jenn Kreider
Carter’s crew, led by Blake, were polite and worked diligently. The deck is very well constructed and will last for many years. The deck will be stained in 2 months but it looks great as it is.


Thomas Sovich
We hired Carter after we had a terrible experience with another contractor. His price was fair and the work was top notch. Will definitely use these guys in the future. Hands down, 10 out 10!


Kimberly Cochrane
[…] Carter was always with his crew onsite building the deck which was very important to us. His construction knowledge extends beyond decks […]


Caleb Peters
[…] They are extremely well versed in the products they install and are professional from the design phase through the finishing touches. […]