
Huge Freestanding Composite Deck
- TimberTech Impression Rail Express
- TimberTech Terrain + Collection
- Complete lighting package
Location: Golden Pond Ct, Indianapolis, IN
Price: $51,000


Part One: Initial Consultation
When you look at this wood deck, you’d say everything was looking good.
But beneath the surface, there were some nasty things happening.
Mike, our client, found us online. He decided he’s done enough staining and repairs on his existing deck and wanted something new.
He gave us a call, we talked to him about what he needs, and then agreed to meet up for a free deck consultation.
In a couple of days we were on his property, taking a look at his old pressure-treated lumber deck.
Some issues with this family's old deck were...

Missing joists
The framing was old and the building codes changed. It was missing several joists.

Unreliable rails

Old floorboards

Damaged boards

Lots of pests
Part Two: The Design, Planning, Permitting
This project was in Hendricks County, and as long as there are no changes to the structure (which were not) and 30 inches or less to the ground (which it is), then no permitting was required. If the new deck didn’t have the same footprint on the ground or if it was elevated above 30 inches, we would’ve need to pull a permit and do several inspections.

This was a fairly complex design. The decking surface was to be split into 5 different areas, all designed for various purposes, like sun-lounging, cookouts, dining, and jacuzzi.

This design is going to help Mike and his family relax and entertain for a long time. We decided to keep the existing framing, and installed the new decking on it.
Part Three: The Time Schedule
James and Natalia were new homeowners on a fix budget, so they didn’t know anything about remodeling. But we made sure everything was clear and transparent at all times, including the schedule.
8th Aug
Mike got his proposal. It included the whole scope of work, the materials used, and the final price. With that, he received his contract.
8th Oct
Mike got the final deck design with all the dimensions and an updated proposal after some change orders. We were ready to start.
9-15th Oct
We removed the old decking surface and railing on the 9th. On the 13th we applied the joist tape to all framing, and then installed the new boards.
22nd Oct
After the final walkthrough and some minor adjustments, the job was finished and we took some professional photos of how it turned out.
This is How Their Deck Upgrade Looked Like
Freestanding TimerTech Composite Deck
This project included:
- Designs and planning
- Removing the old decking surface and rails
- Replace bad joists and other framing issues
- Apply joist tape on all framing, posts, and beams
- Add blocking for the new picture frame and handrail
- Picture frame with TimberTech Terrain + Collection
- Natural White Oak fascia and borders
- Camo/Cortez hidden fasteners
- TimberTech Impression Rail Express
- 16 lights in a complete Lighting Package

TimberTech Terrain + Collection Decking
TimberTech is one of our preferred decking materials because it’s easy to install, very low-maintenance, splinter-free, and remains cold even in the heat of the summer. We combined two colors for a beautiful design.

TimberTech Impression Rail Express
This aluminum railing is one of the most durable and reliable railing solutions on the market. It comes with a great manufacturer warranty and is also covered by our 5-year work warranty.

Complete Lighting Package
Materials And Finishes Used
This Deck Was $51,000
While it wasn’t cheap, this decking area will create so many memories and host so much cookouts that’ll be worth it tenfold.

Hey! I'm Carter, The Owner Of Decks On Point!
I started building decks when I was just 11 years old, helping a family friend on job-sites. I quickly went from handling screws to workers, to carrying materials, and then to build decks myself.
I learned this industry from a young age and now I know the building codes and the materials inside out.
If you want a beautiful deck that goes above the industry’s standards, Decks On Point is your best choice.
You’ll get a streamlined, hassle-free process, a beautiful deck, and a team of experts that’ll keep you in the loop day in and day out.
350+
decks built & repaired
200+
12+
years of experience
3-yr
work warranty
Over 200 Homeowners Love Us!

Craig Replogle
Carter did a great job on my mom’s deck. Showed up everyday as promised even though the weather was not good. Cleaned up and did great work. Very happy. Strongly recommend.


Biniam Gebremichael


Jenn Kreider
Carter’s crew, led by Blake, were polite and worked diligently. The deck is very well constructed and will last for many years. The deck will be stained in 2 months but it looks great as it is.


Thomas Sovich
We hired Carter after we had a terrible experience with another contractor. His price was fair and the work was top notch. Will definitely use these guys in the future. Hands down, 10 out 10!


Kimberly Cochrane
[…] Carter was always with his crew onsite building the deck which was very important to us. His construction knowledge extends beyond decks […]


Caleb Peters
[…] They are extremely well versed in the products they install and are professional from the design phase through the finishing touches. […]
